###
有色金属(冶炼部分):2011,(8):28-31
本文二维码信息
码上扫一扫!
含砷金精矿的酸性热压氧化预处理试验研究
(北京矿冶研究总院冶金设计所)
Acidic Pressure Pre-oxidation of Refractory Gold Ore Containing Arsenopyrite
(Beijing General Research Institute of Mining & Metallurgy)
摘要
图/表
参考文献
相似文献
本文已被:浏览 3279次   下载 61
投稿时间:2028-03-11    
中文摘要: 对某含砷金银精矿进行了酸性热压氧化单因素试验,在210 ℃、停留时间1.5 h、氧分压700 kPa、矿浆浓度20%、搅拌速度800 r/min的优化条件下得到金的回收率95.6%。针对银回收率低下的情况,在80~95 ℃用石灰对热压氧化矿浆进行银强化试验,结果显示银回收率有了大幅度提高,最高达86.3%。
中文关键词: 难处理金矿  毒砂  酸性热压氧化
Abstract:The effects of temperature, retention time, oxygen partial pressure, pulp density and stirring speed were investigated separately in the acidic pressure pre-oxidation experiment with a refractory gold ore containing arsenopyrite. A good gold recovery (95.6%) was obtained under 210 ℃, retention time of 1.5 h, oxygen partial pressure of 700 kPa, pulp density of 20% and stirring speed of 800 r/min. The silver recovery was improved substantially after the silver-enhancement at 80~95 ℃.
文章编号:     中图分类号:    文献标志码:
基金项目:
引用文本:
李大江.含砷金精矿的酸性热压氧化预处理试验研究[J].有色金属(冶炼部分),2011(8):28-31.
LI Da-jiang.Acidic Pressure Pre-oxidation of Refractory Gold Ore Containing Arsenopyrite[J].Nonferrous Metals (Extractive Metallurgy),2011(8):28-31.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号