|
| Reconstruction of Flash Furnace''''s Waste Heat Boiler in Guixi Smelter |
|
|
| View Full Text View/Add Comment Download reader |
| DOI:doi:10.3969/j.issn.1007-7545.年份.期号.顺序号 |
| KeyWord:Flash furnace,Waste heat boiler,Design,Reconstruction |
| WANG Gang,LAO Xue-jing,DE QiangChina Noferrous Engineering , Research Institute,Beijing100038,China) |
|
| Hits: 2104 |
| Download times: 16 |
| Abstract: |
| In order to resolve the dust agglutination of flash furnace's waste heat boiler (WHB), that is apparently after the 3rd stage modifications of Guixi Smelter, the new designed convection tube series with new hammer cleaners are substituted the original old screens and tube series, the running practice of WHB shows it has been operating very successfully after reconstruction. |
| Close |
|
|
|