|
| Discussing on Cool Repair Project of Flash Furnace in Jinlong |
|
|
| View Full Text View/Add Comment Download reader |
| DOI:doi:10.3969/j.issn.1007-7545.年份.期号.顺序号 |
| KeyWord:Flash furnace (FF),Cooling repair,Cent segment even to move |
| CHAI Man-lin |
|
| Hits: 2545 |
| Download times: 17 |
| Abstract: |
| Be aimed at concrete contents of FF cooling repair, this paper put forward a construction project that adopt pre-assemble, try to press, pave and build, and then cent segment is even to move to take seat of respond the tower. There by Jinlong attains the purpose of shortening work period and reducing loss in stop production. |
| Close |
|
|
|