Reconstruction of Waste-heat Boiler of Flash Furnace in Guixi Smelter
           
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.年份.期号.顺序号
KeyWord:Flash furnace,Waste-heat boiler,Reconstruction
CHEN Xian-bin
Hits: 2713
Download times: 15
Abstract:
      Along with the third-stage reconstruction has been put in practice in Guixi smelter, there are some problems caused by dust deposit at the entrance of convection section of the waste-heat boiler, thus greatly impacting normal production of flash furnace. It has made good effect after the reconstruction of the waste-heat boiler during heavy repair period from Dec.2003 to Jan.2004.