Transformation Practice of Control System of No.1 Flash Furnace in Guixi Smelter
Received:October 24, 2012  
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2013.02.005
KeyWord:Flash Furnace(FF); DCS; runtime optimization; system; design
  
AuthorInstitution
LIAO Xiao-chun, TU Yan-an, ZHONG Yao-qiu 江铜集团贵溪冶炼厂,江西贵溪
Hits: 2934
Download times: 0
Abstract:
      The transformation and construction process for control system of No.1 flash furnace(FF) in Guixi Smelter was summarized. The transformation design, implementation strategy and main performance in field DCS and runtime optimizing control system of No.1 FF were introduced. The operation and maintenance of this system are summarized.
Close