|
| Transformation Practice of Control System of No.1 Flash Furnace in Guixi Smelter |
| Received:October 24, 2012 |
| View Full Text View/Add Comment Download reader |
| DOI:doi:10.3969/j.issn.1007-7545.2013.02.005 |
| KeyWord:Flash Furnace(FF); DCS; runtime optimization; system; design |
| Author | Institution |
| LIAO Xiao-chun, TU Yan-an, ZHONG Yao-qiu |
江铜集团贵溪冶炼厂,江西贵溪 |
|
| Hits: 2934 |
| Download times: 0 |
| Abstract: |
| The transformation and construction process for control system of No.1 flash furnace(FF) in Guixi Smelter was summarized. The transformation design, implementation strategy and main performance in field DCS and runtime optimizing control system of No.1 FF were introduced. The operation and maintenance of this system are summarized. |
| Close |