Transformation of Route C of No.2 Flash Furnace in Guixi Smelter
Received:October 24, 2012            Published Online:January 18, 2013
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2013.02.010
KeyWord:route of waste gas; copper water jacket; ascend funnel; flash smelting
  
AuthorInstitution
XU Dong-xiang 江铜集团贵溪冶炼厂,江西贵溪
Hits: 2931
Download times: 0
Abstract:
      Normal production was seriously disrupted by high stoppage rate of route C since No.2 flash furnace of Guixi Smelter was put into production. Route C was transformed in annual examination with the aim to solve the existing problems. The transformation guarantees normal production of flash furnace.
Close