| Transformation of Route C of No.2 Flash Furnace in Guixi Smelter |
|
Received:October 24, 2012
Published Online:January 18, 2013
|
| View Full Text View/Add Comment Download reader |
| DOI:doi:10.3969/j.issn.1007-7545.2013.02.010 |
| KeyWord:route of waste gas; copper water jacket; ascend funnel; flash smelting |
| Author | Institution |
| XU Dong-xiang |
江铜集团贵溪冶炼厂,江西贵溪 |
|
| Hits: 2931 |
| Download times: 0 |
| Abstract: |
| Normal production was seriously disrupted by high stoppage rate of route C since No.2 flash furnace of Guixi Smelter was put into production. Route C was transformed in annual examination with the aim to solve the existing problems. The transformation guarantees normal production of flash furnace. |