| Practice on Reconstruction of Casting System for Precious Metals |
|
Received:September 24, 2012
Revised:September 30, 2012
Accepted:October 08, 2012
Published Online:February 19, 2013
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2013.03.017 |
| KeyWord:casting system; intermediate frequency furnace; clamping device; coding machine; reconstruction |
| Author | Institution |
| daifengxian |
云南铜业股份有限公司冶炼加工总厂稀贵分厂 |
| XU Yang-liang |
云南铜业股份有限公司 |
| CHEN Yong-kang |
云南铜业股份有限公司 |
|
| Hits: 2526 |
| Download times: 2602 |
| Abstract: |
| The optimum technical transformations were put forward to address the existing problems of current casting system for precious metals. The general situation of newly developed equipment and reconstructed system were elaborated. The plant practice shows that the percentage of primary casting approval and capacity of casting system are improved obviously. Energy conservation and economic benefits are improved remarkably. |