|
| Process and Plant Practice of Indium Recovery from Zinc Hydrometallurgy Waste Residue |
|
Received:November 14, 2012
Revised:December 20, 2012
Accepted:December 21, 2012
Published Online:April 23, 2013
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2013.05.012 |
| KeyWord:zinc metallurgy; waste residue; indium; recovery |
| Author | Institution |
| wangjianfang |
商洛学院化学与化学工程系 |
| zhuangshukai |
商洛学院化学与化学工程系 |
| yangheping |
陕西锌业有限公司 |
| lijiantao |
商洛学院化学与化学工程系 |
|
| Hits: 3990 |
| Download times: 4139 |
| Abstract: |
| Indium recovery from alkali slag and prolonging of service period of organic phase in the production line with an annual output of 20 tons of indium were introduced. The existing problems in indium recovery from high fluoride, chlorine and arsenic bearing materials and the measures adopted were summarized. The results show that the technical reconstruction improves indium ingot output, reduces production cost, and obtains good economic and social benefits. |
| Close |