Interval Spraying Bioleaching Process of Low-Grade Uranium Heap Leaching Residue
Received:March 22, 2013   Revised:March 25, 2013   Accepted:March 26, 2013      Published Online:September 29, 2013
View Full Text  View/Add Comment  Download reader
DOI:10.3969/j.issn.1007-7545.2013.10.011
KeyWord:low-grade uranium slag; bioleaching; interval spraying
              
AuthorInstitution
HUANG Jun-rong 东华理工大学
LiJiang 东华理工大学
GuoQin 东华理工大学
wangxuegang 东华理工大学水资源与环境学院
SUN Zhan-xue 东华理工大学
Hits: 2674
Download times: 2575
Abstract:
      The low grade uranium heap leaching tailing was column bioleached with different spraying intervals. The spray amount of three columns is 2% each time. The spraying is 6 h in duration with intervals of 18 h, 42 h, and 66 h respectively. The results show that uranium leaching rate is 87.83%, 77.23%, and 80.60% respectively after 300-day of spraying and 100-day of placement and washing. The uranium concentration in leaching solution is 50 mg/L above.