|
| Interval Spraying Bioleaching Process of Low-Grade Uranium Heap Leaching Residue |
|
Received:March 22, 2013
Revised:March 25, 2013
Accepted:March 26, 2013
Published Online:September 29, 2013
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2013.10.011 |
| KeyWord:low-grade uranium slag; bioleaching; interval spraying |
| Author | Institution |
| HUANG Jun-rong |
东华理工大学 |
| LiJiang |
东华理工大学 |
| GuoQin |
东华理工大学 |
| wangxuegang |
东华理工大学水资源与环境学院 |
| SUN Zhan-xue |
东华理工大学 |
|
| Hits: 2674 |
| Download times: 2575 |
| Abstract: |
| The low grade uranium heap leaching tailing was column bioleached with different spraying intervals. The spray amount of three columns is 2% each time. The spraying is 6 h in duration with intervals of 18 h, 42 h, and 66 h respectively. The results show that uranium leaching rate is 87.83%, 77.23%, and 80.60% respectively after 300-day of spraying and 100-day of placement and washing. The uranium concentration in leaching solution is 50 mg/L above. |
| Close |