|
| Behavior and Removal of Calcium and Magnesium in Zinc Hydrometallurgy |
|
Received:July 16, 2013
Revised:July 18, 2013
Accepted:July 19, 2013
Published Online:December 23, 2013
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2014.01.001 |
| KeyWord:zinc hydrometallurgy; calcium; magnesium; metal balance; removal method |
| Author | Institution |
| Wang Shaolong |
云南冶金集团股份有限公司 |
| Leiting |
云南冶金集团股份有限公司 |
| Shizhe |
昆明理工大学材料与冶金工程学院 |
| Zhang Dianbin |
云南驰宏锌锗股份有限公司 |
| Xie Fuhua |
云南驰宏锌锗股份有限公司 |
|
| Hits: 2696 |
| Download times: 3251 |
| Abstract: |
| The behavior of calcium and magnesium in zinc hydrometallurgy process was analyzed. Metal balance diagram of calcium and magnesium was established in combination with data of 100 kt/a production line to provide basis for calcium and magnesium removal. The methods for calcium and magnesium removal were introduced, which had been in application in this producing line for eight years. |
| Close |