Plant Practice and Design Optimition for Comprehensive Recovery of High-lead Bearing Zinc Oxide Dust
Received:January 10, 2014   Revised:January 13, 2014   Accepted:January 14, 2014      Published Online:December 24, 2014
View Full Text  View/Add Comment  Download reader
DOI:10.3969/j.issn.1007-7545.2015.01.003
KeyWord:zinc oxide; dust; production practice; design improvement
                 
AuthorInstitution
SEN Wei 云南锡业股份有限公司
Peng lin 云南锡业股份有限公司
Lei-sheng 云南锡业股份有限公司
YANG Ji-sheng 云南锡业股份有限公司
SONG Xing-cheng 云南锡业股份有限公司
SUN Hong-yan 红河学院理学院
Hits: 2403
Download times: 2980
Abstract:
      The plant practice and design optimition for comprehensive recovery of high-lead bearing zinc oxide dust with capacity of 25 kt/a were summarized. Technical research needs to focus on processes to remove fluorine, chlorine, antimony and arsenic. This project serves as a reference for design and production practice of similar smelting projects.