| Pilot-plant Test of Resource Utilization of Red Mud in Guangxi Pingguo Aluminum |
|
Received:March 14, 2014
Revised:March 18, 2014
Accepted:March 19, 2014
Published Online:August 21, 2014
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2014.09.009 |
| KeyWord:red mud; resource comprehensive utilization; pilot-plant test; valuable metals |
| Author | Institution |
| Yingbang Xie |
广西冶金研究院 广西南宁 |
| Haihong Zhan |
广西冶金研究院 广西南宁 |
| Hangjun He |
广西冶金研究院 广西南宁 |
| Boji Li |
广西冶金研究院 广西南宁 |
| Yanjin Fan |
广西冶金研究院 广西南宁 |
| Huanlong liang |
广西冶金研究院 广西南宁 |
| Lumei Man |
广西冶金研究院 广西南宁 |
|
| Hits: 2056 |
| Download times: 2704 |
| Abstract: |
| Pilot-plant test on resource utilization of red mud in Guangxi Pingguo Aluminum was conducted. Valuable metals, such as iron, aluminum, titanium and scandium, were recovered by process of “iron reduction smelting, smelting slag acidolysis, leaching, aluminum precipitation, scandium extraction, scandium stripping, scandium purification”. The leaching residue was applied as industrial gypsum. Zero discharge of wastewater in whole process was realized with significant economic and social benefits. |
| Close |
|
|
|