Pilot-plant Test of Resource Utilization of Red Mud in Guangxi Pingguo Aluminum
Received:March 14, 2014   Revised:March 18, 2014   Accepted:March 19, 2014      Published Online:August 21, 2014
View Full Text  View/Add Comment  Download reader
DOI:10.3969/j.issn.1007-7545.2014.09.009
KeyWord:red mud; resource comprehensive utilization; pilot-plant test; valuable metals
                    
AuthorInstitution
Yingbang Xie 广西冶金研究院 广西南宁
Haihong Zhan 广西冶金研究院 广西南宁
Hangjun He 广西冶金研究院 广西南宁
Boji Li 广西冶金研究院 广西南宁
Yanjin Fan 广西冶金研究院 广西南宁
Huanlong liang 广西冶金研究院 广西南宁
Lumei Man 广西冶金研究院 广西南宁
Hits: 2056
Download times: 2704
Abstract:
      Pilot-plant test on resource utilization of red mud in Guangxi Pingguo Aluminum was conducted. Valuable metals, such as iron, aluminum, titanium and scandium, were recovered by process of “iron reduction smelting, smelting slag acidolysis, leaching, aluminum precipitation, scandium extraction, scandium stripping, scandium purification”. The leaching residue was applied as industrial gypsum. Zero discharge of wastewater in whole process was realized with significant economic and social benefits.
Close