|
| Industrial Test on Treatment of Nickeliferous Waste Alloy by Converter |
|
Received:April 29, 2014
Revised:April 30, 2014
Accepted:May 04, 2014
Published Online:September 19, 2014
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2014.11.003 |
| KeyWord:converter; waste alloy; pyrometallurgy; thermodynamics; nickel matte |
| Author | Institution |
| YANG Zhenghui |
青海铜业有限责任公司 |
| ZHENG Jianghua |
金川集团有限公司 |
| MA Peng |
金川集团有限公司 |
| TIAN Xiaodi |
青海铜业有限责任公司 |
| YANG Shaohua |
青海铜业有限责任公司 |
|
| Hits: 2410 |
| Download times: 2757 |
| Abstract: |
| The feasibility to recover nickel and cobalt by adding nickeliferous waste alloy during nickel matte converting by converter and slag smelting by electric furnace was investigated. The industrial test results show that this technique is practicable with high recoveries of nickel and cobalt from waste alloy. |
| Close |