| Plant Practice of Slurry Electrolysis of High Arsenic Gold-bearing Stibnite Concentrate |
|
Received:July 24, 2014
Revised:July 25, 2014
Accepted:July 28, 2014
Published Online:October 15, 2014
|
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2014.11.005 |
| KeyWord:Slurry Electrolysis; gold-bearing antimony concentrate; antimony; arsenic; plant practice |
| Author | Institution |
| ZHANG Yong-lu |
北京矿冶研究总院 |
| WANG Cheng-yan |
北京矿冶研究总院 |
| CHEN Yong-qiang |
北京矿冶研究总院 |
| YANG Yong-qiang |
北京矿冶研究总院 |
| wangwenfan |
湖南新龙矿业有限责任公司 |
| xiexiong |
湖南新邵辰州锑业有限责任公司 |
|
| Hits: 2350 |
| Download times: 3062 |
| Abstract: |
| Designed by Beijing General Research Institute of Mining and Metallurgy, a slurry electrolysis (SE) plant with annual output of 1 000 t electrolysis antimony of high arsenic gold-bearing stibnite concentrate had been put into practice in May 2013. As plant practice indicates, for different concentrate grades, leaching rate of antimony is 98% above, leaching rate of arsenic is 1% below, and arsenic content in cathode antimony is about 0.3%. Gold is enriched in leaching residue, while As and S are hardly leached in process of SE and enriched in leaching residue. Hazards of generation of vast arsenic-alkali residue and low-concentration SO2 gas are avoided. |