Study on Simultaneous Production of Reduced Iron and Bonding Component from Nickel Slag
Received:June 25, 2015   Revised:June 29, 2015   Accepted:July 01, 2015      Published Online:November 18, 2015
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2015.12.014
KeyWord:nickel slag; direct reduction; cementing material
           
AuthorInstitution
LI Xiao-ming 西安建筑科技大学冶金工程学院
XIE Geng 西安建筑科技大学冶金工程学院
ZHAO Jun-xue 西安建筑科技大学冶金工程学院
CUI Ya-ru 西安建筑科技大学冶金工程学院
Hits: 2182
Download times: 2639
Abstract:
      Direct reduction iron and bonding component such as tricalcium silicate (C3S) and dicalcium silicate (C2S) were simultaneously produced from nickel slag by controlling reaction temperature and matching. The effects of carbon dosage, reduction temperature, reduction time, calcium oxide addition, and heating model on experiments were investigated. The results show that iron and cementing material (C3S and C2S) can be simultaneously produced by two-stage heating model, i.e., when reduced at 1 000 ℃ for 40 min firstly and then reduced at 1 480 ℃ for 90 min. Iron recovery rate is 72%, and C3S in cementing material is 55%.