Industrial Pilot Production of Cobalt Removal from Zinc Hydrometallurgy with New Cobalt Removal Regent
Received:March 31, 2017   Revised:April 06, 2017   Accepted:April 07, 2017      Published Online:August 21, 2017
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2017.09.002
KeyWord:new cobalt removal regent; cobalt removal; purification; zinc hydrometallurgy; pilot production
           
AuthorInstitution
YANG Maofeng 来宾华锡冶炼有限公司
ZHANG Xiaoning 来宾华锡冶炼有限公司
TAO Zhengxiu 来宾华锡冶炼有限公司
CHEN Guangyao 来宾华锡冶炼有限公司
Hits: 2040
Download times: 2635
Abstract:
      Industrial pilot production of cobalt removal from zinc hydrometallurgy with new cobalt removal regent was introduced. The results show that it is technologically feasible to remove cobalt from zinc hydrometallurgy with new cobalt removal regent. Solution after four-stage purification can meet the requirement of normal electrowinning production. Electrolysis results show that no negative impact is found on electrowinning production by organic after appropriate measurement is taken to remove residual organic.
Close