Process Study and Application of Dechlorination from Waste Electrolyte in Zinc Hydrometallurgy
Received:June 28, 2017   Revised:June 28, 2017   Accepted:June 28, 2017      Published Online:October 31, 2017
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2017.11.011
KeyWord:copper slag; zinc hydrometallurgy; dechlorination; waste electrolyte
  
AuthorInstitution
Sun Mingsheng 巴彦淖尔紫金有色金属有限公司
Hits: 1941
Download times: 2737
Abstract:
      Dechlorination process of waste electrolyte with copper slag from zinc hydrometallurgy was studied. Chlorine content in dechlorination solution is 100 mg/L below under the optimum conditions including reaction temperature of room temperature, copper slag dosage of 6 kg/m3, and reaction time of 10 min.
Close