|
| Process Optimization and Plant Practice of Cuprous Telluride Precipitation |
| Received:October 11, 2017 Revised:October 11, 2017 |
| View Full Text View/Add Comment Download reader |
| DOI:10.3969/j.issn.1007-7545.2018.03.011 |
| KeyWord:cuprous telluride; precipitation; reduction; replacement; plant practice |
| Author | Institution |
| WANG Jun-e |
厦门紫金矿冶技术有限公司 |
| ZHANG Huan-ran |
紫金铜业有限公司 |
| ZHONG Shui-ping |
紫金铜业有限公司 |
| CHEN Hang |
厦门紫金矿冶技术有限公司 |
| LV Xu-long |
福州大学紫金矿业学院 |
|
| Hits: 1598 |
| Download times: 1666 |
| Abstract: |
| Precipitation process optimization and improvement method of pretreatment of cuprous telluride sludge with copper anode sludge were introduced. The experimental results show that precipitation rate of tellurium rises from 90% to 98% above and dosage of copper powder drops from twice to 1.35 times of theoretical quantity by applying new process of reduction of cuprous telluride slag and replacement with copper powder. Plant practice proves that this new process has comprehensive economic benefit and can achieve high recovery of tellurium in solution. |
| Close |