| Improvement and Practice of Flash Furnace Cooling System in Jinlong Smelter |
|
Received:March 16, 2018
Revised:March 19, 2018
Accepted:March 21, 2018
Published Online:July 16, 2018
|
| View Full Text View/Add Comment Download reader |
| DOI:doi:10.3969/j.issn.1007-7545.2018.08.017 |
| KeyWord:flash furnace; cooling system; improvement |
| Author | Institution |
| HE Jian-ping |
金隆铜业有限公司 |
| XIE Jian-cai |
金隆铜业有限公司 |
| Huang Hui-rong |
金隆铜业有限公司 |
|
| Hits: 2097 |
| Download times: 2436 |
| Abstract: |
| Copper concentrate capacity is improved from original design capacity of 440 kt/a to 1 300 kt/a. Improvement of furnace cooling system, which supports the balance between high concentrate load and furnace heat loads in reaction shaft, settler roof and side wall, R/S-settler joint area, is of significance in every plant repair periods, as a result of increased concentrate treatment capacity and raised S/Cu concentrate. The development and improvement in furnace cooling system is presented. |