Technology Improvement on Treatment of Copper Anode Slime with High Impurity in Kaldo Furnace
Received:September 25, 2019   Revised:September 29, 2019   Accepted:September 30, 2019      Published Online:January 16, 2020
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2020.02.009
KeyWord:Kaldo furnace; low-grade; copper anode slime; optimization; intermediate material
        
AuthorInstitution
HUA Shao-jie 阳谷祥光铜业有限公司
HU Peng-ju 阳谷祥光铜业有限公司
BU Jing-feng 阳谷祥光铜业有限公司
Hits: 2335
Download times: 2149
Abstract:
      With gradual maturity of copper flash smelting and stronger adaptability to treat complex copper ore, more copper anode slime with higher impurity content was produced by subsequent electrolytic refining. To address copper anode slime with high impurity and low-grade gold and silver, optimization and transformation of operation of Kaldo furnace, supporting facility, and controlling of intermediate materials were carried out. Annual processing capacity of Kaldo furnace rises from 2 400 t to 3 800 t, and production capacity of gold and silver is maximized.
Close