|
| Production Practice of World""s First Full Bottom Blowing and Full Hot Continuous Copper Smelting Technology |
|
Received:May 29, 2020
Revised:June 02, 2020
Accepted:June 03, 2020
Published Online:July 17, 2020
|
| View Full Text View/Add Comment Download reader |
| DOI:doi:10.3969/j.issn.1007-7545.2020.08.005 |
| KeyWord:continuous copper smelting; full bottom blowing; full hot state; production practice |
| Author | Institution |
| YUAN Jun-zhi |
包头华鼎铜业发展有限公司 |
| WANG Xin-min |
包头华鼎铜业发展有限公司 |
| ZHAO Fu-sheng |
包头华鼎铜业发展有限公司 |
| Liu Hua |
包头华鼎铜业发展有限公司 |
|
| Hits: 2189 |
| Download times: 2460 |
| Abstract: |
| Huading Copper Development Co., Ltd., successively replaced the original traditional copper smelting process through three stages of transformation, forming the world""s first full-bottom blowing full-hot continuous copper smelting production line, namely SKS smelting + BCC converting + anode furnace refining. The whole process has the characteristics of strong adaptability to raw materials and furnaces, obvious advantages of overall impurity removal, good on-site environmental conditions and low operating costs. The continuous bottom-blowing and full-hot continuous copper smelting process and production practice are introduced. |
| Close |