Overhaul and Transformation of Smelting System in Zijin Copper Co., Ltd.
Received:October 27, 2021   Revised:October 27, 2021   Accepted:November 06, 2021      Published Online:February 18, 2022
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2022.03.008
KeyWord:smelting; transformation; overhaul; indicators
  
AuthorInstitution
GAN Cong 1. 紫金铜业有限公司;2. 福建省铜绿色生产及伴生资源综合利用重点实验室
Hits: 1742
Download times: 2045
Abstract:
      The problems exist in copper smelting system of Zijin Copper Co., Ltd. before transformation were introduced, and overhaul projects in 2020 were introduced. Major problems of the system have been solved after overhaul. Operation rate of flash furnace raises from 98% to 99% above, crushing dust quantity by manpower reduces from 36 pot/d to 15 pot/d, SO2 emissions and particulate emissions reduce about 125 t/a and 50 t/a respectively, and anode copper fuel cost drops from 58.5 RMB/t to 43.5 RMB/t. The smelting system currently can operate in an efficient and environmental friendly way.