Preliminary Study on Regeneration of Bioleaching Copper Tailings from Zijinshan Gold and Copper Mine
Received:May 16, 2023   Revised:May 23, 2023   Accepted:May 29, 2023      Published Online:August 11, 2023
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2023.09.015
KeyWord:Zijinshan gold and copper mine; copper bioleaching; excess acid and iron; old dump; resources regenerating
  
AuthorInstitution
QIU Xiaobin 紫金矿业集团股份有限公司
Hits: 2456
Download times: 1846
Abstract:
      Zijinshan low-grade secondary sulfide copper mine adopts green, high efficiency and low carbon biological copper extraction process, with an annual output of 20 kt of cathode copper. The high sulfur copper ratio in the ore allows the bioleaching process to occur spontaneously without the need for acid supplement and any additives other than water. The net acid production per ton of ore is about 3 kg, resulting in excess acid iron in bioleaching process, need to open circuit, and the spray cycle is economically restricted, generally not more than 200 days. After the end of the spray cycle, the old dump is not removed and been sealed in situ for greening. However, ecological restoration is difficult and costly in acidic environment. The leaching behavior of excess iron and acid solution on the old dump after copper leaching cycle was studied, and the resource utilization direction of the waste was preliminarily studied.
Close