Optimizing of Air Supply Mode for Waste Heat Boiler of Copper Flash Smelting Furnace Based on Numerical Simulation
Received:June 02, 2023   Revised:June 19, 2023   Accepted:June 21, 2023      Published Online:October 09, 2023
View Full Text  View/Add Comment  Download reader
DOI:doi:10.3969/j.issn.1007-7545.2023.11.004
KeyWord:waste heat boiler; copper flash smelting furnace; numerical simulation; sulphation reaction; mixing
              
AuthorInstitution
ZHANG Jinsong 铜陵有色金冠铜业分公司
GAO Longfei 中南大学 能源科学与工程学院
REN Peng 铜陵有色金冠铜业分公司
SONG Yanpo 中南大学 能源科学与工程学院
CHEN Zhuo 中南大学 能源科学与工程学院
Hits: 1496
Download times: 1519
Abstract:
      Dust sulphation reaction has an important influence on dust accretions in Waste Heat Boiler (WHB) of copper flash smelting furnace. In order to perceive and improve the process of dust sulphation in WHB, numerical simulations were conducted for the processes such as flow and heat transfer in the WHB with different air supply modes. An index named Mixing Uniformity (MU) was proposed to reflect indirectly the process state of dust sulphation, and the air supply mode of WHB were evaluated and optimized by using MU. The optimized air supply mode proposed in this study has been applied in practice and achieved good performance.