Reforming Practice of Copper Suspension Smelting Waste Heat Boiler
Received:September 25, 2024   Revised:October 17, 2024   Accepted:October 21, 2024      Published Online:February 21, 2025
View Full Text  View/Add Comment  Download reader
DOI:doi:10.20237/j.issn.1007-7545.2025.03.021
KeyWord:suspension smelting;waste heat boiler;gas damper; first ash hopper; sulphated wind; independent circuit
              
AuthorInstitution
LIU Song 中铜东南铜业有限公司
ZHENG Zhiwei 中铜东南铜业有限公司
YANG Bowen 中铜东南铜业有限公司
XU Shuhan 中铜东南铜业有限公司
HE Guofang 中铜东南铜业有限公司
Hits: 1011
Download times: 1685
Abstract:
      The practice of improving the waste heat boiler in the process of the suspension strengthening copper smelting was briefly described. The formation process of ash accumulation in waste heat boiler and the cause of boiler pipe burst leakage were analyzed. By reforming the independent circuit, adding the first ash hopper, extending the radiation length, adding radiant section heat exchanger plate, optimizing the installation location of the convective header tank, heating the sulphated wind and improving the operation mode of boiler ash coking cleaning, good operation results have been achieved.